Skip to main content

COMPARING THE STRENGHT AS BLOCKS MADE FROM (1) CEMENT AND LATERITIC SOIL (2)CEMENT AND RED EARTH (3) LATERITE, SAND AND RED EARTH

 

ATTENTION

 

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

 

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

 

WHATSAPP US ON  08137701720

 

 

 

 

COMPARING THE STRENGHT AS BLOCKS MADE FROM (1) CEMENT AND LATERITIC SOIL (2)CEMENT AND RED EARTH (3) LATERITE, SAND AND RED EARTH

 

 

ABSTRACT

 

          This case study is “comparing the strength of blocks made from: cement stabilized laterite blocks, cement stabilized red earth blocks and sand,  red earth and laterite blocks and mud blocks dried in the kiln.

 

          This project implement the following analysis

 

(1)             To  effect  reduction to the  rise in market price of sand (fine aggregate), cement blocks to substitute literate blocks.

 

(2)             To determine the strength of the cement stabilized blocks of literate soil in the soil laboratory with a view to have an alternative in the building industry.

 

(3)             To analyse the existing laterite soil and evaluate it’s suitability for use as a good building material by means of various tests.

 

TABLE OF CONTENTS

 

Title page

 

Letter of transmittal

 

Approval page

 

Dedication

 

Acknowledgement

 

Abstract

 

Table of content

 

CHAPTER ONE

 

INTRODUCTION

 

Project Building Materials

 

CHAPTER TWO

 

PREPARATION OF MATERIALS

 

CHAPTER THREE

 

PREPARATION OF CUBE

 

Casting Of The Stabilized Materials

 

Curing Of Specimens

 

CHAPTER FOUR

 

FIRING OF BLOCKS IN KILN

 

Testing Of Blocks

 

Compressive Strength Test

 

Calculation Of Results

 

CHAPTER FIVE

 

DISCUSSION OF RESULT

 

Compressive Strength Table With Eh Cement Mortar Blocks

 

CHAPTER SIX

 

RECOMMENDATION

 

Conclusion

 

References

 

CHAPTER ONE

 

INTRODUCTION

 

This project was obligated to present in o n e volume of the fundamental and practical information in the field of comparing the strength of blocks made from: cement and laterite soil, cement and red earth and sand, red earth and lateritic soil and mud blocks fired in the kiln which may be useful to people involved in civil and structural engineering and particularly those that found pleasure in the design and construction of buildings, bridges and culverts and related structures.

 

          Due to high cost of sand in the market, the comparative analysis of stabilized laterite blocks, red earth blocks and sand blocks have revealed t hat one can definitely substitute the stabilized laterite blocks and mud blocks in place of sand blocks to reduce the cost of the entire building or used stabilized laterite blocks where there are no sand in such an area where the work is going to be sited.  A great have been done throughout this work, although it is limited in scope to assess their suitability as standard concrete aggregates.

 

THE PROJECT BUILDING MATERIALS

 

          To obtain the materials used for these project such as red earth, laterite, sharp sand, and cement, we had to move to the outskirts of Enugu State.  Cement was bought from the famous Keyatta market in Enugu.  The market is well known for the sales of building materials in the state.  Cement was added to the mixture during mixing, to give the mixture a good binding when in shape and also increases the strength of the blocks.  The brand of cement used was ROCK CEMENT.

 

          The red earth material known as mud was obtained at 9th mile corner in Ngwo, at the outskirts of Enugu.  It was dug from a depth, to make sure that it has not been mixed with foreign or any other material. The red earth is dark red in colour, which shows that the mud is of high quality.

 

          Sharp sand was obtained within the school premises and was subsequently gotten from a nearby stream, while that of laterite was obtained from a site at New Layout, in Enugu town.

 

          In conclusion, all the materials used was obtained within Enugu and was kept in good working condition.  We made sure that the materials were of best quality.

 

 

 

 

 

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

 

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

 

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

 

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

 

 

 

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

 

 

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/

https://foreasyprojectmaterials.blogspot.com.ng/

https://mypostumes.blogspot.com.ng/

https://myeasymaterials.blogspot.com.ng/

https://eazyprojectsmaterial.blogspot.com.ng/

https://easzprojectmaterial.blogspot.com.ng/

 

 

 

 

Comments

Popular posts from this blog

DESIGN AND IMPLEMENTATION OF A COMPUTERISED BANKING SYSTEM

  ATTENTION   BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420   WHATSAPP US ON  08137701720       DESIGN AND IMPLEMENTATION OF A COMPUTERISED BANKING SYSTEM     ABSTRACT In this world of competitive resource application and technological development, the banks have been totally computerized. This project work Design and Implementation of computerized banking system is concerned with the analysis and design of a computerized system aimed at supporting the whole banking operation provides an interface which enables the user or the customer to lodge in money into his or her account and make withdrawals as t...

DESIGN AND IMPLEMENTATION OF A COMPUTERISED BANKING SYSTEM

  ATTENTION   BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420   WHATSAPP US ON  08137701720       DESIGN AND IMPLEMENTATION OF A COMPUTERISED BANKING SYSTEM     ABSTRACT In this world of competitive resource application and technological development, the banks have been totally computerized. This project work Design and Implementation of computerized banking system is concerned with the analysis and design of a computerized system aimed at supporting the whole banking operation provides an interface which enables the user or the customer to lodge in money into his or her account and make withdrawals as t...

EFFECT OF COMMUNICATION ON EMPLOYEE PERCEPTION TO CHANGE IN AN ORGANISATION (CASE STUDY OF CHI LIMITED ENUGU)

  ATTENTION: BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420       EFFECT OF COMMUNICATION ON EMPLOYEE PERCEPTION TO CHANGE IN AN ORGANISATION                              (CASE STUDY OF CHI LIMITED ENUGU)     ABSTRACT This study examines the role of communication strategies in change management process in Chi Limited. The research central objective is to conceptualize frame work of the integrated role of communication strategies formulation in conjunction with change management process. ...